Supply of Secondary Pedestals

The objective of this contract is to supply secondary pedestals to support municipal electric warehouse operations.

Document checklist

Includes Contract/MSA
Includes Pricing Documentation
Includes an RFP
Includes Advertisement Documents
Includes Board Approval Resolution
Includes Renewal Documentation
590
Expiration: Aug 02, 2027
1
suppliers
Entity
City of Denton
Coop
(AFI) Alliance for Innovation


Description

This contract provides specification-approved secondary electric connection pedestals used to support safe, reliable, and tamper-resistant utility distribution infrastructure. It connects public utilities with authorized manufacturers and distributors supplying standardized pedestal units designed to meet defined electrical, safety, durability, and labeling requirements.

Key Service Categories

  1. Secondary Electric Pedestal Supply: Single-phase and three-phase above-ground secondary pedestals for utility applications
  2. Pre-Installed Connector Assemblies: Factory-installed multi-port connectors with dielectric covers and oxide inhibitors
  3. Tamper-Resistant Safety Hardware: Stainless steel penta-head locking hardware and padlock-ready designs
  4. Material And Environmental Durability: UV-stabilized, non-conductive, non-corrosive polyethylene construction
  5. Labeling And Safety Identification: Molded warning labels compliant with ANSI and ISO electrical safety standards
  6. Delivery And Warehouse Distribution: FOB destination delivery to centralized municipal utility distribution facilities

Benefits Aligned With Desired Outcomes

  1. Utility system reliability: Standardized pedestal designs support consistent field installation and maintenance
  2. Enhanced public safety: Tamper-resistant hardware and warning labels reduce unauthorized access risks
  3. Specification compliance: Products meet ASTM, ANSI, and utility technical standards
  4. Operational efficiency: As-needed ordering supports ongoing system expansion and replacement programs

Ensure dependable access to compliant secondary electric pedestals that support safe, durable, and efficient municipal utility operations.

Documents

Compliance Checklist

Download Checklist
Download Checklist
Shortlist contract
Shortlisted in

Save to project
Request for information
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Create Project
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Access Restricted

These documents are available only to agencies that are authorized through the relevant Interlocal Agreement (ILA). If you believe your agency qualifies or would like to request access, please contact us for verification.

Quote Requests
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Quote Requests
Suppliers
Label
Quotes Deadline

{deadline}

Description
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Quote Requests
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.