Aluminum Bus Pipe

The objective of this contract is to supply electric maintenance, repair, and construction inventory for municipal electric operations.

Document checklist

Includes Contract/MSA
Includes Pricing Documentation
Includes an RFP
Includes Advertisement Documents
Includes Board Approval Resolution
Includes Renewal Documentation
582
Expiration: Jun 08, 2026
1
suppliers
Entity
City of Denton
Coop
(AFI) Alliance for Innovation


Description

This contract provides specification-compliant aluminum pipe bus materials for use in electric utility substations supporting high-voltage transmission and distribution infrastructure. It connects public utilities with authorized manufacturers and distributors supplying standardized aluminum bus pipe products designed to meet defined electrical, mechanical, and quality requirements.

Key Service Categories

  1. Electric Utility Aluminum Bus Pipe: Seamless extruded aluminum pipe bus for 69kV and 138kV substation applications
  2. Standard Pipe Sizes & Lengths: Schedule 40 aluminum pipe in standard diameters and 40-foot lengths
  3. Authorized Manufacturer Supply: Products supplied by approved manufacturers or authorized distributors
  4. Delivery & Distribution Support: FOB delivery to centralized warehouses or designated substation sites
  5. Quality Control & Inspection Access: Manufacturer quality assurance with City inspection rights
  6. Warranty & Replacement Support: Minimum 12-month warranty with defect replacement at no cost

Benefits Aligned with Desired Outcomes

  1. Infrastructure reliability: Standardized aluminum bus pipe supports consistent substation performance
  2. Specification compliance: Materials meet defined electrical, fabrication, and quality standards
  3. Operational flexibility: As-needed ordering supports phased substation construction programs
  4. Risk reduction: Warranty protections and quality controls reduce material failure exposure

Secure dependable aluminum bus pipe materials that support safe, reliable, and compliant electric utility substation operations.

Documents

Compliance Checklist

Download Checklist
Download Checklist
Shortlist contract
Shortlisted in

Save to project
Request for information
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Create Project
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Access Restricted

These documents are available only to agencies that are authorized through the relevant Interlocal Agreement (ILA). If you believe your agency qualifies or would like to request access, please contact us for verification.

Quote Requests
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Quote Requests
Suppliers
Label
Quotes Deadline

{deadline}

Description
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Quote Requests
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.