Storm Pipe Cleaning and Inspection

This contract provides storm pipe cleaning and CCTV inspection services for municipal drainage systems. The selected supplier will remove debris and blockages, perform televised inspections, deliver Wincan database files and reports, and provide traffic control, restoration, and 24/7 response support as required.

Document checklist

Includes Contract/MSA
Includes Pricing Documentation
Includes an RFP
Includes Advertisement Documents
Includes Board Approval Resolution
Includes Renewal Documentation
783
Expiration: Mar 19, 2029
2
suppliers
Entity
City of Denton
Coop
(AFI) Alliance for Innovation


Description

This contract provides storm drain cleaning and televised inspection services to maintain municipal drainage infrastructure. It connects entities with qualified suppliers that remove debris and blockages, conduct CCTV inspections, and deliver detailed reports and digital data files.

Key Service Categories

  1. High Velocity Jet Cleaning: Hydro jet removal of dirt, sand, debris, and obstructions
  2. Blockage Removal: Mechanical or hydraulic clearing of major line obstructions
  3. CCTV Pipe Inspection: Televised inspection of storm sewer lines and structures
  4. Data And Reporting: Wincan database files, video recordings, maps, and inspection summaries
  5. Traffic Control And Safety: Approved traffic control plans, barricades, and site protection
  6. Site Restoration And Cleanup: Surface restoration, spoil disposal, and daily site cleanliness
  7. Emergency And After Hours Response: 24/7 availability and rapid response scheduling

Benefits Aligned With Desired Outcomes

  1. Improved System Performance: Restores full hydraulic capacity of storm drainage lines
  2. Accurate Condition Assessment: Provides clear video documentation for repair planning
  3. Reduced Flood Risk: Identifies blockages and defects before system failure
  4. Operational Accountability: Weekly progress reports and documented inspection records

These services support proactive stormwater infrastructure maintenance and informed capital repair planning.

Documents

Compliance Checklist

Download Checklist
Download Checklist
Shortlist contract
Shortlisted in

Save to project
Request for information
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Access Contract Documents

Enter your work email to request the full contract package.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Create Project
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Access Restricted

These documents are available only to agencies that are authorized through the relevant Interlocal Agreement (ILA). If you believe your agency qualifies or would like to request access, please contact us for verification.

Quote Requests
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Quote Requests
Suppliers
Label
Quotes Deadline

{deadline}

Description
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Quote Requests
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.